Buy a full case and the price per unit drops automaticallyRequest a sample
AccountCart0
All ContainersBottlesJarsCaps & ClosuresPumps & SprayersTubs & PailsJugsDroppersTinsTubesAccessoriesSeals & LinersCansBags & PouchesVialsLabels & DecorationBuckets & PailsDrumsBoxes & MailersBottling Tools
Industries
Learn

What does Part 111 require, subpart by subpart?

Updated

On this page6

Part 111 has sixteen subparts, A to P, and each one asks for two things: that you do certain work, and that you write down how you do it and prove you did [1]. For a one-person business that adds up to a short shelf of documents: written procedures, specifications, one master manufacturing record per product, one batch production record per batch, quality control sign-offs, logs for cleaning, calibration, receiving, complaints and returns, and reserve samples. The table on this page lists every subpart in plain words with the paper it requires, and links each one to the page that shows how to write it and to the matching template.

The subparts in one table

Section numbers and quoted phrases are from the current eCFR text of 21 CFR Part 111 [1]. "Written procedures" means a standard operating procedure (SOP): your own step-by-step instructions for a task, followed every time.

SubpartWhat it requires, in plain wordsWhat one person keeps in writingWhere it is explained
A. General provisions (111.1 to 111.5)Who is covered: anyone who will "manufacture, package, label, or hold a dietary supplement"; definitions of batch, lot, component, quality control and more (111.3)Nothing of its ownDoes Part 111 apply?
B. Personnel (111.8 to 111.14)Keep anyone who might contaminate product away from it; hygiene; qualified staff; name who is responsible for quality control; qualified supervisorsProcedures for this subpart; training records with "the date of the training, the type of training, and the person(s) trained" (111.14(b)(2))Training and hygiene
C. Physical plant and grounds (111.15 to 111.23)A clean, pest-free, well-lit, ventilated space with safe water, toilets, hand-washing and "separate or defined areas" for each operation (111.20(c))Procedures for cleaning the plant and pest control (111.23(b)); water records where water becomes part of the productThe room where you make supplements
D. Equipment and utensils (111.25 to 111.35)Suitable, cleanable equipment; instruments calibrated "Before first use" and at a set frequency (111.27(b)); cleaning and maintenanceProcedures for calibration and cleaning; equipment logs of use, cleaning and maintenance; calibration records (111.35(b))Equipment cleaning and calibration
E. Production and process control system (111.55 to 111.95)Set specifications for components, in-process points, labels, packaging and the finished product (111.70); test or examine to show they are met, including an identity test on each dietary ingredient (111.75); reserve samples (111.83)Specifications; supplier qualification documentation; test results; the reasoning behind any sampling plan (111.95(b))Writing specifications; what Part 111 requires you to test
F. Quality control (111.103 to 111.140)Quality control approves or rejects specifications, procedures, materials and every finished batch; "conduct all required material reviews and make all required disposition decisions" (111.87)Quality control procedures; dated, signed records of each review, approval or rejection (111.140(b))Quality control when you work alone
G. Components, packaging, labels and product received for packaging or labeling (111.153 to 111.180)Examine every incoming shipment; quarantine until quality control releases it; identify each lot so it can be traced to the supplier and date receivedReceiving records, "including records such as certificates of analysis, suppliers' invoices, and suppliers' guarantees" (111.180(b)(2))Qualifying a supplier; reading a certificate of analysis
H. Master manufacturing record (111.205 to 111.210)A written master record "for each unique formulation" and batch size (111.205(a))One master manufacturing record (MMR) per product and batch sizeThe master manufacturing record
I. Batch production record (111.255 to 111.260)A batch record "every time you manufacture a batch" (111.255(a)), filled in at the time of each stepOne batch production record (BPR) per batchThe batch production record
J. Laboratory operations (111.303 to 111.325)Written procedures for the tests and examinations you run, "adequate laboratory facilities" (111.310), lab controls approved by quality controlTest methods and lab records, whether you test in-house or use an outside labChoosing a lab
K. Manufacturing operations (111.353 to 111.375)Written manufacturing procedures; controls against contamination, mixups and foreign material; labeled containers and equipment during a batch (111.365)Manufacturing proceduresThe master manufacturing record
L. Packaging and labeling operations (111.403 to 111.430)Control "the issuance and use of packaging and labels" (111.410(b)); examine them before use; assign a lot number to each lot (111.415(f)); be able to trace "the complete manufacturing history and control" (111.410(d))Packaging and labeling procedures; records inside the BPRThe batch production record
M. Holding and distributing (111.453 to 111.475)Hold everything under "appropriate conditions of temperature, humidity, and light" (111.455(a)); keep quarantined and released material apart; ship under protective conditionsHolding and distribution procedures; "Records of product distribution" (111.475(b)(2))Holding and distributing product
N. Returned dietary supplements (111.503 to 111.535)Quarantine returns until quality control reviews them (111.510); destroy them unless quality control decides otherwise (111.515)Returns procedures and records of each returnReturned product
O. Product complaints (111.553 to 111.570)A qualified person reviews every complaint and investigates any that may involve a specification failure or a risk of illness or injury (111.560(a))Complaint procedures and a record of each complaint and investigationHandling product complaints
P. Records and recordkeeping (111.605 to 111.610)How long to keep records, in what form, and making them available to FDA (111.610(a))Every record above, kept for the required periodRecords and reserve samples

Most subparts from B to O end with a section that says, in nearly the same words, "You must make and keep records required under this subpart ... in accordance with subpart P of this part" (for example 111.14(a), 111.23(a), 111.35(a), 111.95(a) and 111.475(a)) [1]. Inspectors read these records, and FDA's 2026 warning letters, tabled on what FDA cites at small supplement makers, cite firms for work they could not document. The blank forms for each of these records are collected on Part 111 record templates.

One batch, followed through the subparts

The subparts read as separate chapters, but a batch passes through them in order. Here is one batch of any supplement form, with the subpart that governs each step [1]:

  1. Before anything arrives. You have written specifications (E), a master manufacturing record (H), and procedures for cleaning, calibration, hygiene and each operation (B, C, D, K).
  2. Ingredients and bottles arrive. You examine each shipment and quarantine it (G), test or examine each dietary ingredient for identity (E), and quality control releases the lots (F).
  3. You clean and check the equipment. Cleaning and calibration go in the equipment logs (D).
  4. You make the batch. You follow the master record and fill in the batch record as each step happens: lots used, weights, in-process checks, yield (I, K).
  5. You package and label. Labels are issued, checked and counted, and each lot gets its number (L).
  6. Quality control reviews. The batch record, test results and any deviations are reviewed, and the batch is released or rejected, with a dated signature (F).
  7. You keep reserve samples and store the product. Reserve samples go aside in the container you sell in (E, M), and product is held under the conditions in your specification (M).
  8. You ship. Each shipment is recorded by lot so a recall can find it (M).
  9. Afterward. Complaints and returns are logged and reviewed (N, O), and every record is kept for the required period (P).

What changes by supplement form

Part 111 does not name dosage forms. The same subparts apply to capsules, tablets, gummies, powders and liquids [1]. What changes is what your own specifications and in-process controls contain. A capsule maker's master record includes fill weight checks; a powder maker's includes blend uniformity; a liquid or gummy maker's includes the controls that keep microbes from growing, which 111.365 asks for in general terms, such as "Performing manufacturing operations under conditions and controls that protect against the potential for growth" of microorganisms [1]. Those form-specific controls belong in your specifications and master record, and each form's own book covers them.

How FDA checks this

FDA investigators inspect against these subparts, and the findings in recent warning letters fall mostly in subparts E, F, H and I: missing specifications, no quality control procedures, and no master or batch records. The table of those findings, each tied to its fix, is on what FDA cites at small supplement makers.

Where to begin writing

Most makers start with specifications, because the master record, the tests and the quality control release all point back to them. Go next to writing specifications, then build the master manufacturing record for your first product.

References

  1. Electronic Code of Federal Regulations, 21 CFR Part 111, Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements, subparts A to P, up to date as of August 13, 2026 (last amended August 12, 2026), read November 19, 2026. https://www.ecfr.gov/current/title-21/chapter-I/subchapter-B/part-111